Awaab's Law is the most consequential change to UK housing regulation in a generation. It is named after Awaab Ishak, a two-year-old boy who died in December 2020 from a respiratory condition caused by prolonged exposure to mould in the Rochdale flat his family had repeatedly reported as unfit. The coroner's findings — and the political fallout — produced a statutory duty on social landlords to investigate and remedy damp and mould hazards within fixed timeframes. For damp surveyors, it has reshaped the working week.

This post explains what the law actually says, what it requires surveyors to produce, what changed in 2026, and where the most common compliance failures occur.

The legal foundation

The full citation is Awaab's Law (section 10A of the Landlord and Tenant Act 1985, inserted by the Social Housing (Regulation) Act 2023, and the Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025). It works as an implied term of social housing tenancies. The detailed timeframes are set by the Regulations, which came into force on 27 October 2025.

The headline obligation is straightforward: where a landlord becomes aware of a relevant hazard, statutory clocks begin. Damp and mould fall squarely within the scope of relevant hazards in the first phase of the regulations.

The timeframes (as they stand in 2026)

The regulations — in force for damp and mould since 27 October 2025 — set fixed clocks in working days. For damp and mould hazards the sequence is:

  • Emergency hazards (immediate and significant risk to health or safety, e.g. extensive mould affecting an asthmatic occupant): investigate and complete the relevant safety work as soon as reasonably practicable and within 24 hours. The 24-hour limit for the safety work does not apply where the landlord instead meets the temporary rehousing requirements.
  • Significant hazards: investigate within 10 working days of the landlord becoming aware; provide a written summary of findings to the tenant, usually within 3 working days of the investigation concluding; and complete the relevant safety work within 5 working days of the investigation concluding.
  • Supplementary preventative work must begin within 5 working days of the investigation concluding or, where that is not reasonably practicable, within 12 weeks, and be completed within a reasonable period, with the tenant kept informed throughout.

The clock starts when the landlord becomes aware of the hazard — not when the surveyor is commissioned. This matters because tenants now report damp directly to landlords with the expectation of a 10-working-day investigation, which means surveyors are routinely instructed at day 5, 6, or 7. Slippage in the survey stage compresses everything downstream.

What an Awaab's Law-compliant report must contain

The regulations don't prescribe a report template, but the case law and ombudsman determinations since the Act's commencement have established what a defensible report looks like:

  1. Inspection date and time, surveyor name, and qualifications.
  2. Affected rooms, with photographic evidence time-stamped and geo-tagged.
  3. Diagnosis of damp type — penetrating, rising, condensation, plumbing leak, building defect — supported by readings (moisture meter, hygrometer, surface temperature where relevant).
  4. HHSRS hazard scoring (Cat 1 / Cat 2) with stated methodology.
  5. Health context: occupant vulnerabilities (children, elderly, respiratory conditions). This determines whether the emergency tier applies.
  6. Recommended remedial works with priority and indicative timeframes.
  7. Tenant guidance for managing risk during the works window.

Reports lacking any of these elements are routinely cited by the Housing Ombudsman as evidence of maladministration when tenants escalate.

What changed in 2026

Two material changes have come into effect this year. First, the reformed HHSRS came into force on 23 June 2026: 29 hazards became 21 and the A–J bands were replaced by High, Medium and Low, with the Category 1 threshold unchanged. The Renters' Rights Act 2025 also provides for Awaab's Law-style obligations to reach the private rented sector, but that extension follows consultation and no commencement date has been confirmed.

Second, the revised Decent Homes Standard treats damp and mould as an explicit failure criterion rather than a generic HHSRS hazard. Stock condition surveys for housing associations have become noticeably more prescriptive about how damp and mould findings must be captured.

The five common compliance failures

From ombudsman determinations and our own conversations with stock teams, these are the recurring failure patterns:

  • Date discipline: the inspection date is recorded but not the date the landlord became aware of the hazard, so the 10-working-day investigation clock cannot be evidenced as having been met.
  • Health vulnerability not captured: surveyor inspects the property but never asks whether anyone in the household has asthma or is under five. Without that information, the emergency tier cannot be ruled out.
  • Photographic gaps: photos taken on a personal camera roll and uploaded later, with no metadata linking them to the inspection. Tribunal-grade evidence requires unbroken chain of custody.
  • HHSRS hand-waving: report says "Cat 1" but shows no working — no calculation of likelihood and harm outcomes. The ombudsman has explicitly criticised this.
  • Edits after issue: surveyor amends the report weeks later in response to landlord feedback, without versioning. If the case escalates, two different versions of "the report" exist in evidence — fatal for credibility.

Practical implications for surveyors

The combined effect of Awaab's Law, the Renters' Rights Act, and the Decent Homes Standard is that damp surveying has become a regulated, time-pressured, evidence-heavy practice. The pre-2023 working pattern — visit, take photos, type up a report next week, send PDF — does not survive contact with statutory deadlines and ombudsman scrutiny.

The surveyors thriving in this environment have moved their entire workflow on-site: capture in real time on the phone, photographs auto-attached to findings, HHSRS scoring built into the form, timestamped audit trail, report generated and sent before they leave the property. SurveyMate exists because that workflow couldn't be cobbled together from Word and a camera roll.

See our guide to writing defensible damp survey reports for the structural template, or read about how SurveyMate handles compliance by default.

Where to read the law itself

  • Awaab's Law (section 10A of the Landlord and Tenant Act 1985, inserted by the Social Housing (Regulation) Act 2023, and the Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025)
  • Renters' Rights Act 2025, Part 4 (extension to PRS)
  • Housing Ombudsman's 2024 spotlight report on damp and mould
  • RICS UK Residential Property Standards (4th edition)

These are the source documents every working damp surveyor should be familiar with. Awaab's Law is not going to soften — the regulations are scheduled to widen further in 2027 — and the surveyors who treat compliance as a first-class concern will continue to get the work.

Run damp surveys for a living?

SurveyMate is the on-site damp and mould inspection platform built for UK surveyors and housing teams. Capture findings on your phone, generate branded PDFs in seconds, stay compliant with Awaab's Law by default.