Module 6 · Retrofit and Moisture Risk

6.6 How Retrofits Actually Fail

9 min read

Post-retrofit damp cases arrive without their history, and the useful skill is recognising which of a small number of patterns you are looking at. They recur because they arise from the structure of how retrofit is procured and delivered rather than from unusual technical circumstances — which also means each has a check that would have caught it, and that check is what belongs in your recommendation.

Learning objectives

By the end of this lesson you will be able to:

  • Recognise the recurring retrofit failure patterns from their site evidence.
  • Identify the documentation that establishes what was assumed.
  • Attribute a failure without overreaching on what the evidence supports.
  • Recommend the check that prevents recurrence.

Key terms

Measure-led delivery
Installing a chosen measure across a stock, rather than assessing each dwelling and choosing measures for it. The structural origin of several of these patterns.
Pre-existing condition
A defect present before the works. Insulating over one is the most preventable failure in this list.
Attribution
Establishing what a failure was caused by, distinguishing works from pre-existing conditions and from occupancy change.
As-built divergence
The gap between what was designed and what was installed. Frequently the whole explanation, and invisible without documentation.
Part of the paid course

Read the rest of Retrofit and Moisture Risk

Module 1 is free to read in full — Retrofit and Moisture Risk is part of the £299 practitioner course. Enrol with your email below, then buy on the course page: because you'll already be enrolled, that's one click straight to checkout, with nothing to type twice.

No card needed to enrol — that's a separate step on the course page. We'll email you about the course and about SurveyMate, and you can unsubscribe at any time. See our privacy policy.