Module 6 · Retrofit and Moisture Risk

6.6 How Retrofits Actually Fail

9 min read

Post-retrofit damp cases arrive without their history, and the useful skill is recognising which of a small number of patterns you are looking at. They recur because they arise from the structure of how retrofit is procured and delivered rather than from unusual technical circumstances — which also means each has a check that would have caught it, and that check is what belongs in your recommendation.

Learning objectives

By the end of this lesson you will be able to:

  • Recognise the recurring retrofit failure patterns from their site evidence.
  • Identify the documentation that establishes what was assumed.
  • Attribute a failure without overreaching on what the evidence supports.
  • Recommend the check that prevents recurrence.

Key terms

Measure-led delivery
Installing a chosen measure across a stock, rather than assessing each dwelling and choosing measures for it. The structural origin of several of these patterns.
Pre-existing condition
A defect present before the works. Insulating over one is the most preventable failure in this list.
Attribution
Establishing what a failure was caused by, distinguishing works from pre-existing conditions and from occupancy change.
As-built divergence
The gap between what was designed and what was installed. Frequently the whole explanation, and invisible without documentation.
Free — enrol to continue

Read the rest of Retrofit and Moisture Risk

Module 1 is open to everyone. The remaining six modules — building science, each damp mechanism in depth, meters and thermal imaging, the full inspection method, and report writing — are free too. We just ask for an email so you can pick up where you left off, and so we can send your certificate when you finish.

No card, no account needed. We'll email you about the course and about SurveyMate, and you can unsubscribe at any time. See our privacy policy.