Module 7 · Proportionate Remediation

7.6 Proving the Fix Worked

8 min read

Damp work is unusual in that the outcome is not visible on completion. A re-plastered wall looks perfect the day it is finished whether or not it will still be dry in a year, and both the good repair and the bad one are indistinguishable at handover. That makes verification more than good practice — it is the only way anybody, including you, finds out whether the diagnosis was right.

Learning objectives

By the end of this lesson you will be able to:

  • Design a verification stage into the specification from the start.
  • Set targets that can be measured and defended.
  • Interpret verification results, including partial success.
  • Use verification as the feedback that improves your own diagnosis.

Key terms

Verification point
A recorded location, depth and method that can be re-measured after works to compare against the baseline.
Baseline
The pre-works measurements at the verification points. Without it there is nothing to compare against and no verification is possible.
Target
The value at which the works are considered successful, derived from the material's air-dry EMC in the finished conditions, or from a control.
Verification period
The elapsed time and conditions over which drying is assessed. Must span a heating season for anything driven by seasonal wetting.
Free — enrol to continue

Read the rest of Proportionate Remediation

Module 1 is open to everyone. The remaining six modules — building science, each damp mechanism in depth, meters and thermal imaging, the full inspection method, and report writing — are free too. We just ask for an email so you can pick up where you left off, and so we can send your certificate when you finish.

No card, no account needed. We'll email you about the course and about SurveyMate, and you can unsubscribe at any time. See our privacy policy.